Task

The water supply and sanitation project in Backan, Vietnam covered survey, detailed design, construction, supply and installation of equipment, material, technology transfer and training.

Solution

Treated water quality is to meet Vietnamese standards.

Flow of WWTP: 3,600 m3/d
Pipelines: total 80 km