Task
The water supply and sanitation project in Backan, Vietnam covered survey, detailed design, construction, supply and installation of equipment, material, technology transfer and training.
Solution
Treated water quality is to meet Vietnamese standards.
- Survey and design of all items
- Construction and equipment for a new wastewater treatment plant
- Construction of wastewater pipeline network and pumping stations
- Construction of water supply
- Construction of drinking water pipeline network
- Personnel training
Flow of WWTP: 3,600 m3/d
Pipelines: total 80 km